Main newsletter

Stay informed of our latest news!

Events

« May 2012 »
SunMonTueWedThuFriSat
12345
6789101112
13141516171819
20212223242526
2728293031

ViaStrada on Facebook

Traffic Engineering

 
ViaStrada undertakes traffic engineering projects for local councils including the design of intersections (such as traffic signals and roundabouts), safety audits, peer reviews and transport policy and research.

Red Light Camera Pilot Evaluation Report Peer Review

Project Objective: 
Review a draft research report and provide a literature review

ViaStrada was commissioned by Auckland Transport to edit and review a red light camera pilot evaluation draft report and provide an international literature review. The project was completed in one week.

Key Contact: 
Andrew Macbeth
Contact us for help with a similar project.
Client: 
Auckland Transport
Location: 
Auckland
Deliverable: 
Extensive comments on draft report; literature review
Project Status: 
Completed March 2011
Read more...

Kaiapoi Heavy Vehicle Tracking Tests

Project Objective: 
Testing to confirm heavy vehicle tracking curves for proposed intersection upgrade

We don't just rely on high tech software, but when we have to design to low tolerances, we do real-world simulation testing to confirm design parameters and build stakeholder support!

Key Contact: 
Warren Lloyd
Contact us for help with a similar project.
Client: 
Waimakariri District Council
Location: 
Kaiapoi
Deliverable: 
Intersection design concept
Project Status: 
Test completed November 2011
Read more...

University to City Cycle Path Scoping Study

Project Objective: 
To identify route and design options for a separated bicycle facility (SBF)

This scoping study for a separated bicycle facility (where cyclists are physically separated from motor vehicles) analysed a variety of routes and design cross-sections between the University of Canterbury and the Christchurch central city. The project, which preceded the Christchurch earthquakes, provides valuable information on the feasibility and costs of separated cycle facilities. There has been considerable public support for cycling through the CCC's public consultation on how to rebuild Christchurch.

Key Contact: 
Andrew Macbeth
Contact us for help with a similar project.
Client: 
Christchurch City Council
Location: 
Christchurch
Deliverable: 
Report
Project Status: 
Completed Jul 2010
Read more...

Implementing a Central City Slow Core in Christchurch

Project Objective: 
Provide transport planning and engineering advice for a reduced speed zone ("slow core") for central Christchurch

Reduced traffic speeds have been shown to improve central city liveability and street activity levels. This ViaStrada project suggested the boundaries, specific techniques, design concepts, and implementation steps needed to create a pedestrian-friendly "slow core" for Christchurch.

Key Contact: 
Andrew Macbeth
Contact us for help with a similar project.
Client: 
Christchurch City Council
Location: 
Christchurch
Deliverable: 
Report
Project Status: 
Completed April 2011
Read more...

Central City Pedestrian Level of Service

Project Objective: 
Investigate ways of improving pedestrian level of service (LOS) at traffic signals in the central city

Pedestrian LOS methodology outputPedestrian LOS methodology outputChristchurch City Council commissioned an investigation into ways of improving pedestrian level of service (LOS) at traffic signals in the central city. The underlying hypothesis of this project is that improving the pedestrian level of service of the central city will increase prosperity.

ViaStrada developed a method of measuring pedestrian LOS and applied this to 32 signalised intersections with 110 pedestrian crossings to develop a detailed proposal for each.

Key Contact: 
Axel Wilke
Contact us for help with a similar project.
Client: 
Christchurch City Council
Location: 
Christchurch
Deliverable: 
Report, spreadsheet and microsimulation model
Project Status: 
Complete
Read more...

Greymouth Pedestrian Linkages

Project Objective: 
Develop a pedestrian network and supporting measures for Greymouth Town Centre

This study focused on enhancing the walkability of the Greymouth Town Centre.  The comprehensive final report covered high level strategic planning through to detailed recommendations for site specific design investigations.

 

Key Contact: 
John Lieswyn
Contact us for help with a similar project.
Client: 
Grey District Council
Location: 
Greymouth, West Coast South Island New Zealand
Deliverable: 
Study report and supporting action plan spreadsheet
Project Status: 
Completed August 2011
Read more...

Earthquake Recovery - Waimakariri District, Canterbury

Project Objective: 
To assist with the earthquake infrastructure recovery in Kaiapoi

Following the 4 September 2010 earthquake, ViaStrada has been engaged by Waimakariri District Council to provide traffic engineering advice to create streetscape concept designs that reflect the needs and desires of the residents for a range of transport choices.

Key Contact: 
Warren Lloyd
Contact us for help with a similar project.
Client: 
Waimakariri District Council
Location: 
Kaiapoi, Pines Beach and Kairaki
Deliverable: 
Streetscape concept plans
Project Status: 
Ongoing
Read more...

Peer review of proposed Walding Street upgrade - Palmerston North

Project Objective: 
Peer review

ViaStrada was commissioned by Palmerston North City Council to peer review the concept plans of proposed changes to Walding Street, an arterial road that forms part of the city's ring road system.

Key Contact: 
Warren Lloyd
Contact us for help with a similar project.
Client: 
Palmerston North City Council
Location: 
Palmerston North
Deliverable: 
Peer review
Project Status: 
Complete
Read more...

Road Safety Audit - Invercargill

Project Objective: 
Scheme design stage road safety audit

ViaStrada's traffic engineers undertook a scheme design stage safety audit of a proposed upgrade of Elles Road, Invercargill. Elles Road is a busy arterial in a commercial area of Invercargill and features many commercial entrances, traffic signals and a pedestrian crossing. The audit was carried out in accordance with Austroads and NZTA guidelines.

Key Contact: 
Axel Wilke
Contact us for help with a similar project.
Client: 
Invercargill City Council
Location: 
Invercargill
Deliverable: 
Scheme design stage road safety audit
Project Status: 
Complete
Read more...

Road Safety Audit - Roundabout in Palmerston North

Project Objective: 
Preliminary design stage road safety audit

Preliminary design stage safety audit of a proposed roundabout at the intersection of a local road and a collector road. The roundabout is to replace the existing priority controlled crossroads.

ViaStrada recognise the need for careful horizontal and vertical geometric design to make roundabouts safer for all road users and bring this expertise to safety auditing of roundabouts.

The audit was carried out in accordance with Austroads and NZTA guidelines.

Key Contact: 
Warren Lloyd
Contact us for help with a similar project.
Client: 
Palmerston North City Council
Location: 
Palmerston North
Deliverable: 
Preliminary design stage road safety audit
Project Status: 
Complete
Read more...