andrew
Personal Information
- First name
- Andrew
- Last Name
- Macbeth
Biography
Andrew is a former director of ViaStrada, now working for Brisbane City Council. He has authored or co-authored the papers as shown below.
Professional Information
- Skype Name
- andrew.macbeth.viastrada
Related content
- Publication
- Christchurch Traffic Screenline Survey 1988
- Bicycle Lanes in Toronto
- Cycle counting - manual, automatic and continuous
- Separated Bicycle Facilities in Christchurch
- Road Classification Systems - Christchurch and Toronto
- The Case Against Cycle Paths
- Sustainable Transport in NZ
- Planning and Design for Cycling – Developing Best Practice in New Zealand
- Creyke Road Living Streets Pilot Project
- New Zealand walking and cycling strategies – best practice
- Planning for Certainty through Sustainable Transportation
- Building Our Way Out of Congestion
- ARTA Cycle Route Network Analysis Tool
- Cycle Route Network Planning Using GIS
- Estimating Demand for New Cycling Facilities in New Zealand
- Draft National Road Hierarchy for SMS
- A National Road Hierarchy - Are We Ready?
- Continuous cycle counting
- Signalised Roundabout Design for Pedestrian and Cyclist Safety
- Mainstreaming active modes on urban and rural roads
- Estimating Demand for Selwyn's Cycleways
- Lake Road Cycle Lane Options
- Integrating sustainable transport, planning and urban design
- Cycling - Catalyst from Copenhagen
- What happens when petrol goes up or buses go down?
- Cycle Use and Collisions in Christchurch (1991)
- Earthquake workshop debrief to IPENZ Transportation Group
- "Before After" Public Forum on Christchurch Earthquake Recovery
- Best Practice for Walking and Cycling
- Transport Network Optimisation Think-Piece
- Walking and Cycling Strategy Stocktake
- NZ Transport Challenges – Two Think Pieces
- NZ Supplement to Austroads GTEP Part 14 Bicycles
- An Illustrated Lexicon of Cycle Facilities
- Automatic Bicycle Counting
